BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20160218T160000Z
DTEND:20160218T170000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Transportation Committee Meeting -- Chena Hot Springs Road Roundabouts
DESCRIPTION:This week's Transportation Committee meeting will be held Thursday\, February 18\, 2016 and will include an update on the Steese Highway/Chena Hot Springs Road Ramp Termini Roundabouts & Steese Highway MP4.5 Off-Ramp Bypass Lane (Project No.: 0650(026)/63467 & 0670(041)NFHWY00020.\n\n\n\nSpeakers include: Isadora Fanning joined the ADOT&PF Traffic Safety Services in June 2015\; coming from NMDOT.  She has seven and a half years in construction engineering with the State of New Mexico.  Prior to her work in NM she worked with Willdan Group in California providing bridge and civil engineering services.\n\n \n\nCarl Heim has worked for 15-years at DOT&PF in both construction and design. He has worked on multiple projects throughout the Fairbanks area including the recently reconstructed College/Margaret/Antoinette Ave intersection next to Geraldo's.\n\n \n\nThe agenda and meeting packet will be available for download soon.\n\n\n\nMISSION: The Transportation Infrastructure Committee advocates for improvement and growth in the transportation infrastructure for the Northern Region including roads\, railroad\, aviation\, terminals\, water access\, pipelines\, and communication and transmission lines\, with the goals of enhancing Fairbanks as the Alaska and Northern Region transportation hub\, and increasing the capability to service international traffic.\n\n\n\nCHAIR: Sarah Lefebvre\, Exclusive Paving & University Redi-Mix\n\n\n\nMEETING TIME: The committee meets weekly from 7AM - 8AM at Denny's Restaurant on Airport Way. \n\n\n\n**All Chamber committee meetings are open to the public and members are encouraged to attend.
X-ALT-DESC;FMTTYPE=text/html:<span style="font-family:arial\,sans-serif\;">This week&#39\;s Transportation Committee meeting will be held Thursday\, February 18\, 2016 and will include an update on the Steese Highway/Chena Hot Springs Road Ramp Termini Roundabouts &amp\; Steese Highway MP4.5 Off-Ramp Bypass Lane (Project No.: 0650(026)/63467 &amp\; 0670(041)NFHWY00020.</span><br />\n<br />\n<strong>Speakers include:</strong> Isadora Fanning joined the ADOT&amp\;PF Traffic Safety Services in June 2015\; coming from NMDOT.&nbsp\; She has seven and a half years in construction engineering with the State of New Mexico.&nbsp\; Prior to her work in NM she worked with Willdan Group in California providing bridge and civil engineering services.<br />\n&nbsp\;<br />\nCarl Heim has worked for 15-years at DOT&amp\;PF in both construction and design. He has worked on multiple projects throughout the Fairbanks area including the recently reconstructed College/Margaret/Antoinette Ave intersection next to Geraldo&rsquo\;s.<br />\n&nbsp\;<br />\n<strong>The agenda and meeting packet <em>will be available for download soon.</em><br />\n<br />\nMISSION:</strong> The Transportation Infrastructure Committee advocates for improvement and growth in the transportation infrastructure for the Northern Region including roads\, railroad\, aviation\, terminals\, water access\, pipelines\, and communication and transmission lines\, with the goals of enhancing Fairbanks as the Alaska and Northern Region transportation hub\, and increasing the capability to service international traffic.<br />\n<br />\n<strong>CHAIR:</strong> Sarah Lefebvre\, Exclusive Paving &amp\; University Redi-Mix<br />\n<br />\n<strong>MEETING TIME: </strong>The committee meets weekly from 7AM - 8AM at Denny&#39\;s Restaurant on Airport Way.&nbsp\;<br />\n<br />\n<em>**All Chamber committee meetings are open to the public and members are encouraged to attend. </em>
LOCATION:Denny's Restaurant
UID:e.106.15346
SEQUENCE:3
DTSTAMP:20260514T003558Z
URL:https://www.fairbankschamber.org/events/details/transportation-committee-meeting-chena-hot-springs-road-roundabouts-02-18-2016-15346
END:VEVENT

END:VCALENDAR
